Plant electrician builder engineers at work installing cable with a pneumatic screwdriver tighten the nut in electical box control cabinet into fuse box. Inspect Electrical Power Feeds. tires marked with different colors, yellow, green, orange wires. Mast

Remaining Time -0:00
Progress: NaN%
Playback Rate
1.00x